UCSB MRT Problem summary

Note this page is a summary of problems that developed on the MRT, which were not present on the SRT.

Summary statistics


Rods with saturated channels or high current

Note module needs to be arcs tested to find cause of saturated channel.
Date Rod number Type Position Pinhole/dead apv channel or high current Link to MRT elog Comments
xxx xxx xxx xxx xxx here xxx

Rods that needed Optohybrid to be reseated

Date Rod number Type Position Comments
xxx xxx xxx xxx

Rods that needed Optohybrid to be swapped

Date Rod Number Type Position Comments
xxx xxx xxx xxx xxx

Rods that needed reseating of connectors

Date Rod number Type Connector Comments
xxx xxx xxx xxx xxx

Rods that needed icc replacement

Date Rod number Type Position Comments
xxx xxx xxx xxx xxx

Rods with bad DCU

Date Rod number Type DCU Link to MRT elog Comments
xxx xxx xxx xxx here

Miscellaneous

Date Rod number Type Position Comments
xxx xxx xxx xxx xxx