Follow
up on action items from Aug 23 Workshop
- FNAL
to install new
SRT GUI from UCSB. DONE
- Ryan to modify his
macro to flag bad DCU thermistors from modules 2&6 .
DONE
- Check
resistivity of non-DCU thermistors after power cycling. On a
couple of rods, both UCSB
and FNAL. DONE at FNAL, not yet at UCSB
- Add results from 1st
cold to XML file DONE, but no CVS update yet
- Add
DecInvOn to XML file.
Also, make sure that runs they are labelled sensibly DONE
- Add
module ID as well
as module position to XML file. DONE
- Append
settings.xml file to XML file. Potential problem, requires
1K
extra lines, more than triples size. Not clear what we decided.
- Change the average values
reported from averaged over a module to
averaged over a chip. DONE
- Add
channel-by-channel CMN,
raw noise, ped DONE
- Take a sample XML file and label every entry with an explanation
(in English). Post on the web somewhere. NOT YET
- DCU temperature readings should be stored only at +20 and -20 in
XML file DONE
- UCSB to figure out why scenario takes so long. Changed pressure delivered by
chiller. Some improvement, now down to 6 hours, needs more work.
- add a CalProf
run
to
SR scenario, make sure that it shows up in Ryan's macro (Ryan).
DONE, but scenario takes 1 hr. Need speed up. Could reduce
no. of events. Jim suggests decrease no. of latency points.
Ryan to try this out.
- UCSB to try to lower noise.
NOT YET
- FNAL
to build
one
DS_L ID=1 and 3 DS_L ID>2. UCSB to build one DS_L ID=2 and 3
DS_L ID>2 NOT YET
- Claudio to contact Duccio re: who does
ICC card swap. DONE.
Duccio thinking about it
- Claudio to remind Marchioro about digital
tests. DONE. Guido
says: "by CMS week".
- Yuri to schedule joint
meeting with Guido, Wim, Frederic
for this Thursday on VRVS.
DONE. Meeting took place.
- FNAL SR test
with
Option 7 cards with and without ground connection. Marvin + Ryan took std run, then run
with 100 kHz noise on CF. There already was large 270 mV
peak-to-through noise!!!! Need to think about it
- Spare cables etc. UCSB nneds,
Steve to give Lenny details. Lenny
needs more info.
- One UCSB Delphi supply flaky.
Claudio to write Duccio. DONE
- Steve to implelment agrred-upon grading
scheme in XML file. NOT YET
- FNAL needs to
follow
up on modules that were removed from rods for various reasons.
Anatoli confirms all errors except one module with crazy noise on chip
5 (?)
- Prepare anecdotal list of problems
NOT YET
FNAL
status
Tested 10 more solution 6 rods on SRT. One fails 2nd redundancy
test consistently.
Also seem to see more noise than usual in SRT.
Almost all new rods burnt in at MRT. One failing module (!)
Took pictures of CLK and CTRL lines, look good.
Want to test with benchtop PS instead of Delphi PS, although this had
been done at UCSB with Guido and Wim.
Wim compiling Lt V30. Will try asap, thne Wim gone for 2 weeks.
Frederic working on FEC SW. Problem: V3 needs new gcc.
Considering upgrade of OS.....
UCSB
status
Steve working on XML files. Guiilame responding to emails.
More
on Spares
Spare TPO and TSC coming from CERN in September. Riverside has
TSC in case of emergency. TPO might be a problem.