Minutes of the April 14, 2005 US ROD meeting

Follow up on action items

  1. The dryer for the UCSB compressed air has arrived.
    Next step: install it; then see if it helps.
    Not yet.

  2. Work on understanding reset problem on FNAL SR.
    Problem solved. There was a 46.7 Ohm resistor on FEC2CCUM that is not
    there on FNAL-MR. Remove the resistor, now works.
    At UCSB, no resistor in MR, 100 Ohm resistor in SR (!!!) Remove it.

  3. Jim has not yet started talking to JT about scripting the
    comparison between ARCS and rod data.

Bad channels appearing on rods

Old action items: New Procedure:

UCSB

Tests of rod 178 (header-error rod from FNAL) continue. Swap
module that gives errors to try to correlate with either rod or module.

DS rod with 3rd cooling plate runs cooler, but T ~ 40 C on hybrid,
T ~ 55 on DCU. Sent mail to experts for advice.
Mark Raymond says that APV within specs of process -- although no real data on it.
No news on DCU.

No progress on understanding SW bug that causes bad pulse shape. Can Valeri help? Need this for pinhole tagging.

Action items:

FNAL

Tested bunch of new HPK rods in SR. Two out of six have broken or shorted
termistor. Strange because Lenny says that these are chcked on rod frame.
Possibilities: bad check on rod frame, or bad connection through flat cable, or bad DCU on hybrid.

Action items: Also, two rods with sporadic I2C errors on SR. Action item: All but one ST rod disassenbled. Have 11 HPK.

Been running for many deys on MR, no header errors, but one
rod shows connectivity errors at same position as module that was removed because
of header errors.

Retested rod 140, old (December), with HPK sensors: no new bad channels.

MR running LT V25. OK.

Still want to add cooling loop to MR

Add 1 hour delay to start of DAQ since at present triggered by manifold
temperature, not rod temperature.

Other action item: