DFA Production Documentation



Please follow the link to a specific task:

  • Receiving a DFA.
  • Surveying a DFA in shipping fixture.
  • Transferring to ringframe.
  • Taping down upilex.
  • Attaching bias connector.
  • Surveying trees.
  • Testing bias bond.
  • Testing other bonds.(...parts of this section are still being written...)
  • Burn-in.

  • Comments or questions? Send mail to Natalia Kuznetsova