UCSB H1 Accounting

H1 size DFA Sextant Status
         
8   2B9 1 SX-04
30   2F7 1 SX-04
37   1F5 1 SX-04
76   1B9 1 SX-04
80   2B10 2 SX-05
81   1B7 2 SX-05
72   2F11 2 SX-05
69   1F10 2 SX-05
82   1B8 3 SX-06
78   2B12 3 SX-06
65 thick 1F9 3 SX-06
60   2F6 3 SX-06
77 ok- 2B11 4 SX-07
83 ok 1B10 4 SX-07
70 ok- 1F8 4 SX-07
64 thin 2F10 4 SX-07
63 ok 1F7 5 SX-08
74 thick 1B4 5 SX-08
73 thin 2B5 5 SX-08
61 thin 2F5 5 SX-08
62 thin 2F9 6 SX-09
49 ok 1F3 6 SX-09
75 very thin 2B15 6 SX-09
14 thick 1B13 6 SX-09
21 thin 1B12 (b1) 7 awaiting final DFA work
66 very thin 2Fx 7 blobbed bonds; HDI testing
68   1F11 7 HDI testing
27 thin 2B4 7 blobbed bonds; HDI testing
31 ok 1B11 test ready for assembly; old spacers
71 thin 2F12 test ready for assembly; hard-to-bond chips
18   1B6 (b1) test testing; back from Italy - chip replaced
28 right ? test? to Italy twice; awaiting sexing
67   F x returned to Italy; "dead"
79   B x returned to Italy; "dead"
33   F ? Berg connector problem
    2B13   high current
    1F2   type B; bonded
    2B3   type B; bonded
    1B3   type B; bonded

Last Updated on 1/19/99
By Philip Hart